April was a month of unexpected things.
1. Scraps: trim, yellow flower blocks, yellow 16 patches. Done.
2. Finish the last two sections on my hexaon quilt and prepare to redo the section I lost. I also need to order a backing for it. I have about half of the final section, but I did redo the lost section.
3. Assemble the New York Beauty blocks, dye or piece a backing, and prepare to quilt. This must be done by the end of school. I’ve started the quilting, so this one is done!
4. If all of the above are easier than I anticipate, I will also work on the last box blocks quilt. It’s a flimsy now.
On the “other sewing” front, I want to keep working on my sunset jogakbo. I’m ready to attach row six.
May will be busy. I have a senior and an 8th grader graduating. Yikes!
1. Scraps: trim, pink flower blocks, pink 16 patches.
2. Finish the last section of my hexagon quilt. Maybe baste it?
3. Finish the New York Beauty quilt and give it away. This is #1 priority for the month.
4. After #3, finish the blue box blocks quilt.
On the “other sewing” front, keep working on the sunset jogakbo and make a chima of hand printed fabric. The chima (wrap skirt) must wait until the New York Beauty quilt is finished.
from the room of Zana’s Ninis,
katie z.
1 comment:
Congrats on all the progress with your April goals. Good luck with all your May goals. Hard to believe your oldest is graduating this year. Time seems to flies when it comes to the kiddos.
Post a Comment